6a. Tutorial - Optimal Capacity Expansion
Introduction
In this part of the tutorial, we are gonna study optimal capacity expansion. Therefore, we are going to enlarge the system from the previous tutorial.
Written system descritption for accesibility: The fuel grid contains four nodes: lignite, gas, hard coal and biomass. There are five units: lignite
powerplant Tudo, CCGT powerplant Rubbo, Hard coal powerplant Rubbo, CCGT powerplant Tudo and biomass powerplant Tudo. The latter two are only investment options. They
are connected to the respective fuel node. In the electric grid, there
are two nodes: Tudo and Rubbo, which have a billateral connection with a
capacity of 400 MW. The lignite powerplant Tudo, the CCGT powerplant Tudo and the biomass powerplant Tudo are connected to the
electric node Tudo, the two other units are connected to the electric
node Rubbo.