4a. Tutorial - Optimal Unit Commitment
Fill the backbone input excel
p_unit
p_unit gives unit specific information which do not depend on the corresponding node. Fill in all units and make them available. In following table, you find information on the effectivity and minimum load parameter.
parameter |
Meaning |
op00 |
Minimum load (as share of unitSize from p_gnu_io) |
op01 |
Point where maximal efficiency is reached (as share of unitSize from p_gnu_io) |
eff00 |
Effectivity at point op00 |
eff01 |
Effectivity at point op01 |
In this case, we will assume the same efficiency for the complete operating range. Fill in all parameters with the information from the following table:
|
Lignite powerplant |
Hard coal powerplant |
CCGT powerplant |
Minimum load (MW) |
60 |
120 |
120 |
Efficiency (%) |
38 |
40 |
53 |